Final Standings
16

Rank 16 of 22

We Maid AI

Best run 6 June 2026, 07:57 pm

580.39

total points

5 / 6 scenarios scoredTop scenario The Operator's Mandate (150.00 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

84.05

points

Cost $869,281 · naive $973,334 · optimal $849,541

Renewable share

41.2%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$682,168
Export credit−$31,462
Carbon cost$81,302
Diesel fuel$0
FCAS revenue$0
Peak demand$105,738
Battery wear$31,413
Blackout penalty$0
Ramp charge$121
Overvoltage$0

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

108.29

points

Cost $1,154,269 · naive $3,327,933 · optimal $1,320,760

Renewable share

28.8%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$773,074
Export credit−$3,005
Carbon cost$124,461
Diesel fuel$27,725
FCAS revenue$0
Peak demand$120,000
Battery wear$71,603
Blackout penalty$0
Ramp charge$40,410
Overvoltage$0

AI Grid Shock

FCAS reserves and regime-aware MPC absorbing sudden grid shocks.

114.12

points

Cost $1,208,670 · naive $5,761,212 · optimal $1,772,024

Renewable share

29.8%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$972,274
Export credit−$6,400
Carbon cost$160,105
Diesel fuel$10,536
FCAS revenue−$115,200
Peak demand$120,000
Battery wear$10,618
Blackout penalty$0
Ramp charge$45,737
Overvoltage$0

The Operator's Mandate

Parse prose ops-briefs into JSON constraints - with a phishing trap.

150.00

points

Cost $14,887,277 · naive $45,262,339 · optimal $28,503,218

Renewable share

38.3%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$8,139,603
Export credit−$8,252
Carbon cost$100,675
Diesel fuel$212,250
FCAS revenue−$11,600
Peak demand$164
Battery wear$16,514
Blackout penalty$0
Ramp charge$31,503
Overvoltage$0

Cybersecurity

Adversarial signals, intrusion detection and attack-aware control.

123.92

points

Cost $1,229,400 · naive $2,838,664 · optimal $1,540,000

Renewable share

39.0%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$1,034,448
Export credit−$11,787
Carbon cost$116,472
Diesel fuel$30,775
FCAS revenue−$112,320
Peak demand$118,000
Battery wear$8,571
Blackout penalty$0
Ramp charge$30,241
Overvoltage$0

The Gauntlet

×3

Not attempted

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

My first strategy · submitted 6 June 2026, 05:47 pm
Loading code…