Rank 15 of 22
Flux Inductors
Best run 6 June 2026, 07:16 pm
593.95
total points
Points contributed to total (Gauntlet ×3)
Per-scenario results
Duck Curve
Solar curtailment and a battery-throughput budget under a steep evening ramp.
82.28
points
Cost $871,472 · naive $973,334 · optimal $849,541
Renewable share
37.3%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Frequency Frenzy
First forecast: ride noisy demand and price swings with lookahead dispatch.
100.03
points
Cost $1,320,070 · naive $3,327,933 · optimal $1,320,760
Renewable share
24.2%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
AI Grid Shock
FCAS reserves and regime-aware MPC absorbing sudden grid shocks.
113.14
points
Cost $1,247,894 · naive $5,761,212 · optimal $1,772,024
Renewable share
34.1%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Operator's Mandate
Parse prose ops-briefs into JSON constraints - with a phishing trap.
0.00
points
Cost $63,972,905 · naive $45,262,339 · optimal $28,503,218
Renewable share
37.6%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Cybersecurity
Adversarial signals, intrusion detection and attack-aware control.
114.02
points
Cost $1,357,955 · naive $2,838,664 · optimal $1,540,000
Renewable share
40.5%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Gauntlet
×372-hour finale folding every mechanic together. Weighted ×3 in the total.
61.49
points
184.47 to total
Cost $5,511,423 · naive $9,937,694 · optimal $2,739,445
Renewable share
35.4%
Unmet demand
11 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Best-performing controller code
The highest-scoring submission this team made for each scenario. Read-only.
.png?alt=media&token=d14521c8-c549-434c-bb27-643ab95189ad)