Final Standings
15

Rank 15 of 22

Flux Inductors

Best run 6 June 2026, 07:16 pm

593.95

total points

6 / 6 scenarios scoredTop scenario The Gauntlet (184.47 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

82.28

points

Cost $871,472 · naive $973,334 · optimal $849,541

Renewable share

37.3%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$679,492
Export credit−$33,201
Carbon cost$86,653
Diesel fuel$0
FCAS revenue$0
Peak demand$111,500
Battery wear$26,750
Blackout penalty$0
Ramp charge$278
Overvoltage$0

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

100.03

points

Cost $1,320,070 · naive $3,327,933 · optimal $1,320,760

Renewable share

24.2%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$870,845
Export credit−$6,174
Carbon cost$125,953
Diesel fuel$56,925
FCAS revenue$0
Peak demand$120,000
Battery wear$44,439
Blackout penalty$0
Ramp charge$108,081
Overvoltage$0

AI Grid Shock

FCAS reserves and regime-aware MPC absorbing sudden grid shocks.

113.14

points

Cost $1,247,894 · naive $5,761,212 · optimal $1,772,024

Renewable share

34.1%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$855,723
Export credit−$5,242
Carbon cost$158,129
Diesel fuel$3,950
FCAS revenue−$40,860
Peak demand$120,000
Battery wear$54,105
Blackout penalty$0
Ramp charge$86,089
Overvoltage$0

The Operator's Mandate

Parse prose ops-briefs into JSON constraints - with a phishing trap.

0.00

points

Cost $63,972,905 · naive $45,262,339 · optimal $28,503,218

Renewable share

37.6%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$26,080,089
Export credit−$8,721
Carbon cost$107,802
Diesel fuel$475
FCAS revenue−$2,000
Peak demand$180
Battery wear$32,618
Blackout penalty$0
Ramp charge$58,810
Overvoltage$0

Cybersecurity

Adversarial signals, intrusion detection and attack-aware control.

114.02

points

Cost $1,357,955 · naive $2,838,664 · optimal $1,540,000

Renewable share

40.5%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$947,062
Export credit−$11,315
Carbon cost$113,581
Diesel fuel$141,255
FCAS revenue−$40,380
Peak demand$120,000
Battery wear$28,174
Blackout penalty$0
Ramp charge$55,078
Overvoltage$0

The Gauntlet

×3

72-hour finale folding every mechanic together. Weighted ×3 in the total.

61.49

points

184.47 to total

Cost $5,511,423 · naive $9,937,694 · optimal $2,739,445

Renewable share

35.4%

Unmet demand

11 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$1,620,343
Export credit−$10,424
Carbon cost$132,857
Diesel fuel$15,533
FCAS revenue−$40,840
Peak demand$120,000
Battery wear$48,421
Blackout penalty$1,308,300
Ramp charge$77,624
Overvoltage$0

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

Multivariate Tuned · submitted 6 June 2026, 05:20 pm
Loading code…