Final Standings
17

Rank 17 of 22

Inertia

Best run 6 June 2026, 07:58 pm

397.65

total points

5 / 6 scenarios scoredTop scenario Frequency Frenzy (106.46 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

99.72

points

Cost $849,887 · naive $973,334 · optimal $849,541

Renewable share

39.6%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$683,898
Export credit−$28,545
Carbon cost$82,892
Diesel fuel$0
FCAS revenue$0
Peak demand$83,000
Battery wear$24,729
Blackout penalty$0
Ramp charge$103
Overvoltage$3,810

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

106.46

points

Cost $1,191,040 · naive $3,327,933 · optimal $1,320,760

Renewable share

25.4%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$852,565
Export credit−$128
Carbon cost$124,033
Diesel fuel$27,225
FCAS revenue$0
Peak demand$120,000
Battery wear$36,887
Blackout penalty$0
Ramp charge$30,456
Overvoltage$0

AI Grid Shock

FCAS reserves and regime-aware MPC absorbing sudden grid shocks.

89.74

points

Cost $2,181,482 · naive $5,761,212 · optimal $1,772,024

Renewable share

33.9%

Unmet demand

11 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$784,939
Export credit−$6,787
Carbon cost$159,112
Diesel fuel$0
FCAS revenue−$57,265
Peak demand$120,000
Battery wear$60,085
Blackout penalty$1,075,355
Ramp charge$42,874
Overvoltage$0

The Operator's Mandate

Parse prose ops-briefs into JSON constraints - with a phishing trap.

101.73

points

Cost $28,213,527 · naive $45,262,339 · optimal $28,503,218

Renewable share

37.9%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$25,330,531
Export credit−$10,222
Carbon cost$107,111
Diesel fuel$725
FCAS revenue−$47,350
Peak demand$179
Battery wear$12,398
Blackout penalty$0
Ramp charge$32,655
Overvoltage$0

Cybersecurity

Adversarial signals, intrusion detection and attack-aware control.

0.00

points

Cost $4,558,324 · naive $2,838,664 · optimal $1,540,000

Renewable share

40.0%

Unmet demand

32 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$1,050,874
Export credit−$15,934
Carbon cost$119,594
Diesel fuel$0
FCAS revenue−$53,408
Peak demand$120,000
Battery wear$18,398
Blackout penalty$3,159,500
Ramp charge$31,940
Overvoltage$0

The Gauntlet

×3

Not attempted

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

second version · submitted 6 June 2026, 02:56 pm
Loading code…