Final Standings
9

Rank 9 of 22

WattDee

Best run 6 June 2026, 06:18 pm

640.83

total points

6 / 6 scenarios scoredTop scenario The Gauntlet (184.76 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

69.48

points

Cost $887,327 · naive $973,334 · optimal $849,541

Renewable share

40.7%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$687,191
Export credit−$27,780
Carbon cost$82,312
Diesel fuel$0
FCAS revenue$0
Peak demand$119,000
Battery wear$26,466
Blackout penalty$0
Ramp charge$139
Overvoltage$0

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

106.70

points

Cost $1,186,250 · naive $3,327,933 · optimal $1,320,760

Renewable share

29.4%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$826,694
Export credit$0
Carbon cost$123,470
Diesel fuel$23,975
FCAS revenue$0
Peak demand$117,000
Battery wear$52,424
Blackout penalty$0
Ramp charge$42,686
Overvoltage$0

AI Grid Shock

FCAS reserves and regime-aware MPC absorbing sudden grid shocks.

113.64

points

Cost $1,228,053 · naive $5,761,212 · optimal $1,772,024

Renewable share

35.2%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$818,443
Export credit$0
Carbon cost$160,195
Diesel fuel$28,500
FCAS revenue−$32,100
Peak demand$119,000
Battery wear$65,763
Blackout penalty$0
Ramp charge$42,253
Overvoltage$0

The Operator's Mandate

Parse prose ops-briefs into JSON constraints - with a phishing trap.

76.36

points

Cost $32,465,660 · naive $45,262,339 · optimal $28,503,218

Renewable share

35.8%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$32,322,424
Export credit−$8,723
Carbon cost$109,991
Diesel fuel$0
FCAS revenue−$8,820
Peak demand$165
Battery wear$5,501
Blackout penalty$0
Ramp charge$13,122
Overvoltage$0

Cybersecurity

Adversarial signals, intrusion detection and attack-aware control.

89.90

points

Cost $1,671,128 · naive $2,838,664 · optimal $1,540,000

Renewable share

41.6%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$945,207
Export credit−$7,994
Carbon cost$113,987
Diesel fuel$77,773
FCAS revenue−$29,500
Peak demand$119,000
Battery wear$28,637
Blackout penalty$0
Ramp charge$59,964
Overvoltage$0

The Gauntlet

×3

72-hour finale folding every mechanic together. Weighted ×3 in the total.

61.59

points

184.76 to total

Cost $5,504,521 · naive $9,937,694 · optimal $2,739,445

Renewable share

35.4%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$1,721,052
Export credit−$11,119
Carbon cost$134,792
Diesel fuel$5,258
FCAS revenue−$4,530
Peak demand$119,920
Battery wear$53,199
Blackout penalty$0
Ramp charge$152,347
Overvoltage$0

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

wattdee1 · submitted 6 June 2026, 02:45 pm
Loading code…