Rank 8 of 22
Glorpathon
Best run 6 June 2026, 08:06 pm
642.73
total points
Points contributed to total (Gauntlet ×3)
Per-scenario results
Duck Curve
Solar curtailment and a battery-throughput budget under a steep evening ramp.
83.61
points
Cost $869,834 · naive $973,334 · optimal $849,541
Renewable share
41.6%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Frequency Frenzy
First forecast: ride noisy demand and price swings with lookahead dispatch.
107.47
points
Cost $1,170,850 · naive $3,327,933 · optimal $1,320,760
Renewable share
33.6%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
AI Grid Shock
FCAS reserves and regime-aware MPC absorbing sudden grid shocks.
115.21
points
Cost $1,165,412 · naive $5,761,212 · optimal $1,772,024
Renewable share
33.5%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Operator's Mandate
Parse prose ops-briefs into JSON constraints - with a phishing trap.
150.00
points
Cost $17,552,365 · naive $45,262,339 · optimal $28,503,218
Renewable share
40.1%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Cybersecurity
Adversarial signals, intrusion detection and attack-aware control.
114.16
points
Cost $1,356,144 · naive $2,838,664 · optimal $1,540,000
Renewable share
40.1%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Gauntlet
×372-hour finale folding every mechanic together. Weighted ×3 in the total.
24.10
points
72.29 to total
Cost $8,203,251 · naive $9,937,694 · optimal $2,739,445
Renewable share
32.5%
Unmet demand
14 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴