Final Standings
8

Rank 8 of 22

Glorpathon

Best run 6 June 2026, 08:06 pm

642.73

total points

6 / 6 scenarios scoredTop scenario The Operator's Mandate (150.00 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

83.61

points

Cost $869,834 · naive $973,334 · optimal $849,541

Renewable share

41.6%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$680,345
Export credit−$29,499
Carbon cost$80,720
Diesel fuel$0
FCAS revenue$0
Peak demand$105,738
Battery wear$32,414
Blackout penalty$0
Ramp charge$116
Overvoltage$0

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

107.47

points

Cost $1,170,850 · naive $3,327,933 · optimal $1,320,760

Renewable share

33.6%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$793,625
Export credit$0
Carbon cost$121,904
Diesel fuel$20,225
FCAS revenue$0
Peak demand$120,000
Battery wear$54,443
Blackout penalty$0
Ramp charge$60,653
Overvoltage$0

AI Grid Shock

FCAS reserves and regime-aware MPC absorbing sudden grid shocks.

115.21

points

Cost $1,165,412 · naive $5,761,212 · optimal $1,772,024

Renewable share

33.5%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$841,772
Export credit−$3,285
Carbon cost$156,566
Diesel fuel$1,250
FCAS revenue−$85,200
Peak demand$120,000
Battery wear$50,036
Blackout penalty$0
Ramp charge$33,272
Overvoltage$0

The Operator's Mandate

Parse prose ops-briefs into JSON constraints - with a phishing trap.

150.00

points

Cost $17,552,365 · naive $45,262,339 · optimal $28,503,218

Renewable share

40.1%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$15,790,888
Export credit−$5,504
Carbon cost$102,445
Diesel fuel$159,050
FCAS revenue−$29,525
Peak demand$176
Battery wear$35,073
Blackout penalty$0
Ramp charge$119,497
Overvoltage$0

Cybersecurity

Adversarial signals, intrusion detection and attack-aware control.

114.16

points

Cost $1,356,144 · naive $2,838,664 · optimal $1,540,000

Renewable share

40.1%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$974,447
Export credit−$11,722
Carbon cost$113,987
Diesel fuel$87,078
FCAS revenue−$900
Peak demand$120,000
Battery wear$15,388
Blackout penalty$0
Ramp charge$32,365
Overvoltage$0

The Gauntlet

×3

72-hour finale folding every mechanic together. Weighted ×3 in the total.

24.10

points

72.29 to total

Cost $8,203,251 · naive $9,937,694 · optimal $2,739,445

Renewable share

32.5%

Unmet demand

14 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$1,634,485
Export credit−$13,062
Carbon cost$133,531
Diesel fuel$20,970
FCAS revenue−$28,174
Peak demand$120,000
Battery wear$28,497
Blackout penalty$1,677,600
Ramp charge$77,511
Overvoltage$0

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

My first strategy · submitted 6 June 2026, 03:04 pm
Loading code…