Rank 10 of 22
ACE
Best run 6 June 2026, 07:59 pm
639.37
total points
Points contributed to total (Gauntlet ×3)
Per-scenario results
Duck Curve
Solar curtailment and a battery-throughput budget under a steep evening ramp.
97.72
points
Cost $852,359 · naive $973,334 · optimal $849,541
Renewable share
40.1%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Frequency Frenzy
First forecast: ride noisy demand and price swings with lookahead dispatch.
107.57
points
Cost $1,168,917 · naive $3,327,933 · optimal $1,320,760
Renewable share
29.9%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
AI Grid Shock
FCAS reserves and regime-aware MPC absorbing sudden grid shocks.
113.49
points
Cost $1,233,707 · naive $5,761,212 · optimal $1,772,024
Renewable share
34.5%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Operator's Mandate
Parse prose ops-briefs into JSON constraints - with a phishing trap.
82.47
points
Cost $31,441,033 · naive $45,262,339 · optimal $28,503,218
Renewable share
39.4%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Cybersecurity
Adversarial signals, intrusion detection and attack-aware control.
76.34
points
Cost $1,847,265 · naive $2,838,664 · optimal $1,540,000
Renewable share
40.3%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Gauntlet
×372-hour finale folding every mechanic together. Weighted ×3 in the total.
53.93
points
161.78 to total
Cost $6,055,983 · naive $9,937,694 · optimal $2,739,445
Renewable share
31.1%
Unmet demand
5 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Best-performing controller code
The highest-scoring submission this team made for each scenario. Read-only.
.png?alt=media&token=d14521c8-c549-434c-bb27-643ab95189ad)