19

Rank 19 of 22

K-Electric

Best run 6 June 2026, 05:53 pm

298.24

total points

3 / 6 scenarios scoredTop scenario AI Grid Shock (116.79 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

73.89

points

Cost $881,863 · naive $973,334 · optimal $849,541

Renewable share

41.5%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$680,612
Export credit−$31,443
Carbon cost$81,120
Diesel fuel$0
FCAS revenue$0
Peak demand$119,000
Battery wear$32,415
Blackout penalty$0
Ramp charge$161
Overvoltage$0

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

107.57

points

Cost $1,168,827 · naive $3,327,933 · optimal $1,320,760

Renewable share

30.3%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$818,170
Export credit$0
Carbon cost$121,106
Diesel fuel$51,498
FCAS revenue$0
Peak demand$95,000
Battery wear$50,937
Blackout penalty$0
Ramp charge$32,116
Overvoltage$0

AI Grid Shock

FCAS reserves and regime-aware MPC absorbing sudden grid shocks.

116.79

points

Cost $1,102,435 · naive $5,761,212 · optimal $1,772,024

Renewable share

35.2%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$775,142
Export credit−$3,875
Carbon cost$156,835
Diesel fuel$23,457
FCAS revenue−$57,200
Peak demand$101,437
Battery wear$64,172
Blackout penalty$0
Ramp charge$31,467
Overvoltage$0

The Operator's Mandate

Not attempted

Cybersecurity

Not attempted

The Gauntlet

×3

Not attempted

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

My first strategy · submitted 6 June 2026, 04:09 pm
Loading code…