Rank 19 of 22
K-Electric
Best run 6 June 2026, 05:53 pm
298.24
total points
Points contributed to total (Gauntlet ×3)
Per-scenario results
Duck Curve
Solar curtailment and a battery-throughput budget under a steep evening ramp.
73.89
points
Cost $881,863 · naive $973,334 · optimal $849,541
Renewable share
41.5%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Frequency Frenzy
First forecast: ride noisy demand and price swings with lookahead dispatch.
107.57
points
Cost $1,168,827 · naive $3,327,933 · optimal $1,320,760
Renewable share
30.3%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
AI Grid Shock
FCAS reserves and regime-aware MPC absorbing sudden grid shocks.
116.79
points
Cost $1,102,435 · naive $5,761,212 · optimal $1,772,024
Renewable share
35.2%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Operator's Mandate
Not attempted
Cybersecurity
Not attempted
The Gauntlet
×3Not attempted
Best-performing controller code
The highest-scoring submission this team made for each scenario. Read-only.
.png?alt=media&token=d14521c8-c549-434c-bb27-643ab95189ad)