Final Standings
20

Rank 20 of 22

eAssist

Best run 6 June 2026, 06:43 pm

191.68

total points

2 / 6 scenarios scoredTop scenario Frequency Frenzy (102.26 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

89.42

points

Cost $862,641 · naive $973,334 · optimal $849,541

Renewable share

39.4%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$669,557
Export credit−$29,797
Carbon cost$83,879
Diesel fuel$0
FCAS revenue$0
Peak demand$111,500
Battery wear$27,271
Blackout penalty$0
Ramp charge$230
Overvoltage$0

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

102.26

points

Cost $1,275,411 · naive $3,327,933 · optimal $1,320,760

Renewable share

29.5%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$783,276
Export credit−$313
Carbon cost$123,126
Diesel fuel$41,925
FCAS revenue$0
Peak demand$120,000
Battery wear$71,514
Blackout penalty$0
Ramp charge$135,882
Overvoltage$0

AI Grid Shock

Not attempted

The Operator's Mandate

Not attempted

Cybersecurity

Not attempted

The Gauntlet

×3

Not attempted

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

My first strategy · submitted 6 June 2026, 05:44 pm
Loading code…