20
Rank 20 of 22
eAssist
Best run 6 June 2026, 06:43 pm
191.68
total points
2 / 6 scenarios scoredTop scenario Frequency Frenzy (102.26 pts)
Points contributed to total (Gauntlet ×3)
Per-scenario results
Duck Curve
Solar curtailment and a battery-throughput budget under a steep evening ramp.
89.42
points
Cost $862,641 · naive $973,334 · optimal $849,541
Renewable share
39.4%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Import tariff$669,557
Export credit−$29,797
Carbon cost$83,879
Diesel fuel$0
FCAS revenue$0
Peak demand$111,500
Battery wear$27,271
Blackout penalty$0
Ramp charge$230
Overvoltage$0
Frequency Frenzy
First forecast: ride noisy demand and price swings with lookahead dispatch.
102.26
points
Cost $1,275,411 · naive $3,327,933 · optimal $1,320,760
Renewable share
29.5%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Import tariff$783,276
Export credit−$313
Carbon cost$123,126
Diesel fuel$41,925
FCAS revenue$0
Peak demand$120,000
Battery wear$71,514
Blackout penalty$0
Ramp charge$135,882
Overvoltage$0
AI Grid Shock
Not attempted
The Operator's Mandate
Not attempted
Cybersecurity
Not attempted
The Gauntlet
×3Not attempted
Best-performing controller code
The highest-scoring submission this team made for each scenario. Read-only.
My first strategy · submitted 6 June 2026, 05:44 pm
Loading code…