Final Standings
18

Rank 18 of 22

Flaming Cheetos

Best run 6 June 2026, 07:17 pm

385.10

total points

5 / 6 scenarios scoredTop scenario Frequency Frenzy (105.44 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

80.81

points

Cost $873,301 · naive $973,334 · optimal $849,541

Renewable share

38.5%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$690,522
Export credit−$31,011
Carbon cost$84,631
Diesel fuel$0
FCAS revenue$0
Peak demand$95,400
Battery wear$23,771
Blackout penalty$0
Ramp charge$116
Overvoltage$9,872

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

105.44

points

Cost $1,211,617 · naive $3,327,933 · optimal $1,320,760

Renewable share

27.1%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$878,261
Export credit−$3,634
Carbon cost$125,104
Diesel fuel$20,225
FCAS revenue$0
Peak demand$120,000
Battery wear$28,894
Blackout penalty$0
Ramp charge$42,767
Overvoltage$0

AI Grid Shock

FCAS reserves and regime-aware MPC absorbing sudden grid shocks.

87.80

points

Cost $2,258,858 · naive $5,761,212 · optimal $1,772,024

Renewable share

32.4%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$831,676
Export credit−$6,571
Carbon cost$158,588
Diesel fuel$250
FCAS revenue−$43,200
Peak demand$120,000
Battery wear$49,994
Blackout penalty$0
Ramp charge$22,371
Overvoltage$0

The Operator's Mandate

Parse prose ops-briefs into JSON constraints - with a phishing trap.

34.27

points

Cost $39,518,410 · naive $45,262,339 · optimal $28,503,218

Renewable share

38.6%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$27,588,762
Export credit−$10,102
Carbon cost$108,171
Diesel fuel$0
FCAS revenue−$43,200
Peak demand$149
Battery wear$16,945
Blackout penalty$0
Ramp charge$15,314
Overvoltage$0

Cybersecurity

Adversarial signals, intrusion detection and attack-aware control.

76.79

points

Cost $1,841,424 · naive $2,838,664 · optimal $1,540,000

Renewable share

40.7%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$1,023,031
Export credit−$9,484
Carbon cost$115,381
Diesel fuel$42,073
FCAS revenue−$870
Peak demand$120,000
Battery wear$20,006
Blackout penalty$0
Ramp charge$20,526
Overvoltage$0

The Gauntlet

×3

Not attempted

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

My second strategy · submitted 6 June 2026, 03:56 pm
Loading code…