Final Standings
21

Rank 21 of 22

Energygpt

Best run 6 June 2026, 03:51 pm

177.21

total points

3 / 6 scenarios scoredTop scenario Frequency Frenzy (106.58 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

70.63

points

Cost $885,899 · naive $973,334 · optimal $849,541

Renewable share

38.5%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$712,394
Export credit−$32,104
Carbon cost$84,624
Diesel fuel$0
FCAS revenue$0
Peak demand$100,400
Battery wear$20,503
Blackout penalty$0
Ramp charge$83
Overvoltage$0

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

106.58

points

Cost $1,188,716 · naive $3,327,933 · optimal $1,320,760

Renewable share

23.9%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$843,105
Export credit−$161
Carbon cost$121,460
Diesel fuel$20,225
FCAS revenue$0
Peak demand$120,000
Battery wear$30,800
Blackout penalty$0
Ramp charge$53,288
Overvoltage$0

AI Grid Shock

FCAS reserves and regime-aware MPC absorbing sudden grid shocks.

0.00

points

Cost $5,772,569 · naive $5,761,212 · optimal $1,772,024

Renewable share

32.5%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$888,432
Export credit−$3,375
Carbon cost$153,652
Diesel fuel$24,250
FCAS revenue$0
Peak demand$120,000
Battery wear$29,764
Blackout penalty$0
Ramp charge$59,845
Overvoltage$0

The Operator's Mandate

Not attempted

Cybersecurity

Not attempted

The Gauntlet

×3

Not attempted

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

Base strategy · submitted 6 June 2026, 02:14 pm
Loading code…