Rank 12 of 22
Pika Pika
Best run 6 June 2026, 08:04 pm
619.47
total points
Points contributed to total (Gauntlet ×3)
Per-scenario results
Duck Curve
Solar curtailment and a battery-throughput budget under a steep evening ramp.
96.75
points
Cost $853,564 · naive $973,334 · optimal $849,541
Renewable share
39.8%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Frequency Frenzy
First forecast: ride noisy demand and price swings with lookahead dispatch.
108.01
points
Cost $1,159,988 · naive $3,327,933 · optimal $1,320,760
Renewable share
31.1%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
AI Grid Shock
FCAS reserves and regime-aware MPC absorbing sudden grid shocks.
113.72
points
Cost $1,224,621 · naive $5,761,212 · optimal $1,772,024
Renewable share
35.9%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Operator's Mandate
Parse prose ops-briefs into JSON constraints - with a phishing trap.
150.00
points
Cost $12,050,056 · naive $45,262,339 · optimal $28,503,218
Renewable share
36.9%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Cybersecurity
Adversarial signals, intrusion detection and attack-aware control.
115.80
points
Cost $1,334,846 · naive $2,838,664 · optimal $1,540,000
Renewable share
44.6%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Gauntlet
×372-hour finale folding every mechanic together. Weighted ×3 in the total.
11.73
points
35.20 to total
Cost $9,093,214 · naive $9,937,694 · optimal $2,739,445
Renewable share
36.0%
Unmet demand
25 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Best-performing controller code
The highest-scoring submission this team made for each scenario. Read-only.
.png?alt=media&token=d14521c8-c549-434c-bb27-643ab95189ad)