Rank 13 of 22
DAAKSS
Best run 6 June 2026, 07:59 pm
611.92
total points
Points contributed to total (Gauntlet ×3)
Per-scenario results
Duck Curve
Solar curtailment and a battery-throughput budget under a steep evening ramp.
108.77
points
Cost $838,683 · naive $973,334 · optimal $849,541
Renewable share
40.6%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Frequency Frenzy
First forecast: ride noisy demand and price swings with lookahead dispatch.
109.65
points
Cost $1,127,062 · naive $3,327,933 · optimal $1,320,760
Renewable share
29.5%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
AI Grid Shock
FCAS reserves and regime-aware MPC absorbing sudden grid shocks.
115.55
points
Cost $1,151,787 · naive $5,761,212 · optimal $1,772,024
Renewable share
31.4%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Operator's Mandate
Parse prose ops-briefs into JSON constraints - with a phishing trap.
150.00
points
Cost $9,306,818 · naive $45,262,339 · optimal $28,503,218
Renewable share
37.2%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Cybersecurity
Adversarial signals, intrusion detection and attack-aware control.
127.95
points
Cost $1,177,048 · naive $2,838,664 · optimal $1,540,000
Renewable share
40.4%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Gauntlet
×372-hour finale folding every mechanic together. Weighted ×3 in the total.
0.00
points
0.00 to total
Cost $13,034,697 · naive $9,937,694 · optimal $2,739,445
Renewable share
35.5%
Unmet demand
30 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Best-performing controller code
The highest-scoring submission this team made for each scenario. Read-only.
.png?alt=media&token=d14521c8-c549-434c-bb27-643ab95189ad)