Final Standings
4

Rank 4 of 22

ILoveEnergy

Best run 6 June 2026, 08:12 pm

762.57

total points

6 / 6 scenarios scoredTop scenario The Gauntlet (239.48 pts)

Points contributed to total (Gauntlet ×3)

Per-scenario results

Duck Curve

Solar curtailment and a battery-throughput budget under a steep evening ramp.

51.98

points

Cost $908,983 · naive $973,334 · optimal $849,541

Renewable share

42.0%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$685,467
Export credit−$9,673
Carbon cost$85,636
Diesel fuel$0
FCAS revenue$0
Peak demand$108,700
Battery wear$38,546
Blackout penalty$0
Ramp charge$306
Overvoltage$0

Frequency Frenzy

First forecast: ride noisy demand and price swings with lookahead dispatch.

107.39

points

Cost $1,172,379 · naive $3,327,933 · optimal $1,320,760

Renewable share

29.5%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$776,739
Export credit$0
Carbon cost$122,860
Diesel fuel$40,100
FCAS revenue$0
Peak demand$120,000
Battery wear$62,498
Blackout penalty$0
Ramp charge$50,182
Overvoltage$0

AI Grid Shock

FCAS reserves and regime-aware MPC absorbing sudden grid shocks.

110.58

points

Cost $1,349,815 · naive $5,761,212 · optimal $1,772,024

Renewable share

34.6%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$755,900
Export credit−$622
Carbon cost$162,369
Diesel fuel$1,000
FCAS revenue−$34,353
Peak demand$120,000
Battery wear$72,897
Blackout penalty$0
Ramp charge$45,261
Overvoltage$0

The Operator's Mandate

Parse prose ops-briefs into JSON constraints - with a phishing trap.

150.00

points

Cost $11,058,432 · naive $45,262,339 · optimal $28,503,218

Renewable share

40.2%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$10,639,358
Export credit−$5,901
Carbon cost$102,065
Diesel fuel$186,625
FCAS revenue−$39,796
Peak demand$164
Battery wear$38,924
Blackout penalty$0
Ramp charge$39,616
Overvoltage$0

Cybersecurity

Adversarial signals, intrusion detection and attack-aware control.

103.13

points

Cost $1,499,326 · naive $2,838,664 · optimal $1,540,000

Renewable share

45.2%

Unmet demand

0 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$918,444
Export credit−$10,774
Carbon cost$114,960
Diesel fuel$64,890
FCAS revenue−$35,438
Peak demand$120,000
Battery wear$55,241
Blackout penalty$0
Ramp charge$68,070
Overvoltage$0

The Gauntlet

×3

72-hour finale folding every mechanic together. Weighted ×3 in the total.

79.83

points

239.48 to total

Cost $4,191,620 · naive $9,937,694 · optimal $2,739,445

Renewable share

36.2%

Unmet demand

1 kWh

Controller errors

0

Steps completed

288

Show cost breakdown ▾
Import tariff$1,437,692
Export credit−$9,816
Carbon cost$130,912
Diesel fuel$115,453
FCAS revenue−$35,225
Peak demand$120,000
Battery wear$53,538
Blackout penalty$179,100
Ramp charge$89,874
Overvoltage$0

Best-performing controller code

The highest-scoring submission this team made for each scenario. Read-only.

ILoveEnergy-duck_curve · submitted 6 June 2026, 07:48 pm
Loading code…