Rank 4 of 22
ILoveEnergy
Best run 6 June 2026, 08:12 pm
762.57
total points
Points contributed to total (Gauntlet ×3)
Per-scenario results
Duck Curve
Solar curtailment and a battery-throughput budget under a steep evening ramp.
51.98
points
Cost $908,983 · naive $973,334 · optimal $849,541
Renewable share
42.0%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Frequency Frenzy
First forecast: ride noisy demand and price swings with lookahead dispatch.
107.39
points
Cost $1,172,379 · naive $3,327,933 · optimal $1,320,760
Renewable share
29.5%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
AI Grid Shock
FCAS reserves and regime-aware MPC absorbing sudden grid shocks.
110.58
points
Cost $1,349,815 · naive $5,761,212 · optimal $1,772,024
Renewable share
34.6%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Operator's Mandate
Parse prose ops-briefs into JSON constraints - with a phishing trap.
150.00
points
Cost $11,058,432 · naive $45,262,339 · optimal $28,503,218
Renewable share
40.2%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Cybersecurity
Adversarial signals, intrusion detection and attack-aware control.
103.13
points
Cost $1,499,326 · naive $2,838,664 · optimal $1,540,000
Renewable share
45.2%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Gauntlet
×372-hour finale folding every mechanic together. Weighted ×3 in the total.
79.83
points
239.48 to total
Cost $4,191,620 · naive $9,937,694 · optimal $2,739,445
Renewable share
36.2%
Unmet demand
1 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Best-performing controller code
The highest-scoring submission this team made for each scenario. Read-only.
.png?alt=media&token=d14521c8-c549-434c-bb27-643ab95189ad)