Rank 5 of 22
got no rizz
Best run 6 June 2026, 07:48 pm
690.85
total points
Points contributed to total (Gauntlet ×3)
Per-scenario results
Duck Curve
Solar curtailment and a battery-throughput budget under a steep evening ramp.
107.37
points
Cost $840,423 · naive $973,334 · optimal $849,541
Renewable share
40.2%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Frequency Frenzy
First forecast: ride noisy demand and price swings with lookahead dispatch.
109.86
points
Cost $1,122,827 · naive $3,327,933 · optimal $1,320,760
Renewable share
28.0%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
AI Grid Shock
FCAS reserves and regime-aware MPC absorbing sudden grid shocks.
116.52
points
Cost $1,113,002 · naive $5,761,212 · optimal $1,772,024
Renewable share
32.6%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Operator's Mandate
Parse prose ops-briefs into JSON constraints - with a phishing trap.
150.00
points
Cost $8,528,355 · naive $45,262,339 · optimal $28,503,218
Renewable share
37.6%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Cybersecurity
Adversarial signals, intrusion detection and attack-aware control.
128.45
points
Cost $1,170,528 · naive $2,838,664 · optimal $1,540,000
Renewable share
41.1%
Unmet demand
0 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
The Gauntlet
×372-hour finale folding every mechanic together. Weighted ×3 in the total.
26.22
points
78.65 to total
Cost $8,050,457 · naive $9,937,694 · optimal $2,739,445
Renewable share
33.6%
Unmet demand
23 kWh
Controller errors
0
Steps completed
288
Show cost breakdown ▾Hide cost breakdown ▴
Best-performing controller code
The highest-scoring submission this team made for each scenario. Read-only.